2024 Slurry Seal Project Phase II
General Description of Work: The work, in general, consists of pavement maintenance, including: crack sealing; slurry seal; removal and replacement of hot mix asphalt (HMA) paving; traffic striping; traffic control; water pollution control; and related items of work as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Specifications
(click to expand/collapse)
Name | Size | ||
Vol 1 Tech Specs Slurry 03-18-2024 100% | 1.1 MB | ||
Vol 2 Tech Specs Slurry 03-20-2024 100% | 401.7 KB |