2024 Slurry Seal Project Phase II
General Description of Work: The work, in general, consists of pavement maintenance, including: crack sealing; slurry seal; removal and replacement of hot mix asphalt (HMA) paving; traffic striping; traffic control; water pollution control; and related items of work as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Plans
(click to expand/collapse)
Name | Size | ||
2024 Calistoga Slurry Seal Project Phase II Plans | 1.4 MB |