2024 Slurry Seal Project Phase II
General Description of Work: The work, in general, consists of pavement maintenance, including: crack sealing; slurry seal; removal and replacement of hot mix asphalt (HMA) paving; traffic striping; traffic control; water pollution control; and related items of work as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Status
Bidding Closed
Bid Date | 4/15/24 2:00pm |
Location
Calistoga, CA
The Engineer's Estimate is $495,000.