Calistoga EV Charging Stations at Community Center and Pool Project

Project Description/Scope of Work: The purpose of this project is to install Level 2 electric vehicle charging stations (EVCS), two spaces at the Community Pool served by one dual port station and and three spaces at the Fire Station served by one dual port station and one single port station. The work generally consists of hot mix asphalt (HMA) pavement, installation of new electric vehicle charging stations, conduit, pull boxes, and safety bollards, signs and striping.
Date Company Contact
1698407978
10/27/23 11:59 am
Construct Connect Rye Jumuad
Tel: 323.602.5079
1698075647
10/23/23 8:40 am
Construction Bidboard, Inc. 11622 El Camino Real # 100
San Diego, CA
000 Plan Room
Tel: 800-479-5314
1698075658
10/23/23 8:40 am
Dodge Data and Analytics 2860 S State Highway 161
Suite 501
Grand Prairie, TX 75052
000 Plan Room
Tel: 413-304-2008
Fax: 306-336-2767
1699954758
11/14/23 9:39 am
GEMS Environmental Managment Services Inc. 1120 Willow Pass Court
Concord, CA 94520
Paula Tleimat
Accounting Manager
Tel: (925) 671-6822
Fax: (925) 671-7120
1698075668
10/23/23 8:41 am
Marin Builders Exchange 660 Las Gallinas Avenue
San Rafael, CA 94903
000 Plan Room
Tel: 415-462-1220
1698075488
10/23/23 8:38 am
North Coast Builders Exchange 1030 Apollo Way
Santa Rosa, CA 95407
000 Plan Room
Tel: 707-542-9502
1699969617
11/14/23 1:46 pm
PLEMCo 1638 East Edinger Ave., Ste B
Santa Ana, CA 92705
Brad Rinehart
CEO
Tel: 7142616000
1698075687
10/23/23 8:41 am
Placer County Contractor's Association 10656 Industrial Ave
Ste. 100
Roseville, CA 95678
Plan Room
Tel: 916-771-7229
1698756683
10/31/23 12:51 pm
Quantum Energy Services & Technologies, Inc 490 43RD ST
OAKLAND, CA 94609
derrick rebello
President
Tel: 4156378575