Calistoga EV Charging Stations at Community Center and Pool Project
Project Description/Scope of Work: The purpose of this project is to install Level 2 electric vehicle charging stations (EVCS), two spaces at the Community Pool served by one dual port station and and three spaces at the Fire Station served by one dual port station and one single port station. The work generally consists of hot mix asphalt (HMA) pavement, installation of new electric vehicle charging stations, conduit, pull boxes, and safety bollards, signs and striping.
Addendum 1
(click to expand/collapse)
Name | Size | |||
Addendum #1 EV Charging Stations signed 11-13-2023 | 341.9 KB |