Slurry Seal Project Phase 1 No. 23-5552
The work, in general, consists of pavement maintenance, including:crack sealing; slurry seal; removal and replacement of hot mix asphalt (HMA) paving; traffic striping; traffic control; water pollution control; and related items of work as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Documents
(click to expand/collapse)
Name | Size | ||
Vol 1 Tech Specs Slurry 05-11-2023 100% | 1.0 MB | ||
Vol 2 Tech Specs Slurry 05-11-2023 100% | 399.1 KB |